Fully enclosed gangway for wind farm

A few years ago, in response to a request from DEME, we designed and manufactured a fully enclosed gangway that is no less than 18.5 metres long. This heavy-duty gangway…

A few years ago, in response to a request from DEME, we designed and manufactured a fully enclosed gangway that is no less than 18.5 metres long. This heavy-duty gangway made the transfer from DEME’s vessel to the offshore wind turbines easier. To ensure the safety of the gangway users, we equipped the gangway with an additional handrail and reinforced wheel set.

Do you intend to order a gangway too? If so, please contact us or refer to the product specifications.